Legal Library

Article 647. Obligation to give a notice

Official English translation published by the Legislative Herald of Georgia, edition 140. It corresponds to the Georgian edition shown on this site: 140, consolidated on 25.06.2026.

Only the Georgian text has legal force.

1. The contractor shall notify the client in a timely manner that:

a) the material received from the client is substandard and unfit for use;

b) if the client’s instruction is fulfilled, the work will not be durable or not fit for use;

c) there are other circumstances beyond the contractor’s control that endangers the durability and suitability of the work.

2. If the client, notwithstanding the notice given by the contractor, does not replace the unsuitable or substandard materials within the appropriate period of time, does not change the instructions given on the procedure for performance and/or does not eliminate any other circumstance that can prejudice the suitability or durability of the work, then the contractor may repudiate the contract and claim damages sustained by the repudiation.

Source of the translation: matsne.gov.ge · Georgian text: matsne.gov.ge

Georgian text of this article, with amendment history and the question form