1. If a consignee accepts the freight without inspecting it together with the carrier and does not assert against the carrier any claim of a general nature for loss or damage, then the consignee shall be deemed, until proven otherwise, to have accepted the freight in the condition indicated in the waybill. The claim shall be asserted on the day that the freight is delivered if the matter concerns externally visible shortages or damages, and in the case of externally invisible shortages or damages, then no later than seven days after the delivery of the freight. In the case of externally invisible shortages or damages, the claim (demand) shall be made in writing.
2. If the consignee and the carrier jointly inspect the condition of the freight, proof contradicting the results of the inspection shall be allowed only in the case of externally invisible shortages or damages and if the consignee does not file a written claim within seven days after receipt of the freight.
3. A claim for damages resulting from delay may be asserted only if the consignee submits to the carrier a written claim within twenty one days after receipt of the freight.
4. The days, on which the freight is shipped, inspected and delivered to the consignee, shall not be counted when calculating the times provided for in this article.
5. The carrier and the consignee shall assist each other in conducting the necessary inspections and establishing the necessary facts.